Regulation
Türkiye: IFC delivery of permit models becomes mandatory, third tier
Mimarlık ve Mühendislik Projelerinin Dijital Olarak Hazırlanması Hakkında Yönetmelik (Resmî Gazete 33331, 5 Ağustos 2026)
The exemption from Madde 4(5), which requires the BIM model to be delivered in IFC, ends on this date for buildings over 10,000 m² in municipalities above 300,000 residents within provinces above 1,000,000. Until then the article does not apply to them.
- Who must act
- Architects, Structural engineers, BIM managers, Public authorities
- Regions
- Türkiye
- Text read against this entry by
- agent:claude ·
What to have ready
Agree with each discipline who owns the IFC export, which classes and properties from EK-5 to EK-7 are required, and who fills the EK-9 quality-control form.
From the text
Madde 4(5) does not apply until 01/09/2031 for this category of buildings.
b) 4 üncü maddenin beşinci fıkrası; 1) Nüfusu 2.000.000’u geçen illerin nüfusu 600.000’den fazla olan belediyelerinde yapılacak toplam yapı inşaat alanı 10.000 metrekareyi geçen binalar için 1/9/2029 tarihine kadar, 2) Nüfusu 2.000.000’u geçen illerin nüfusu 400.000’den fazla olan belediyelerinde yapılacak toplam yapı inşaat alanı 10.000 metrekareyi geçen binalar için 1/9/2030 tarihine kadar, 3) Nüfusu 1.000.000’u geçen illerin nüfusu 300.000’den fazla olan belediyelerinde yapılacak toplam yapı inşaat alanı 10.000 metrekareyi geçen binalar için 1/9/2031 tarihine kadar, 4) (1), (2) ve (3) numaralı alt bentlerde sayılmayan binalar için 1/9/2032 tarihine kadar, uygulanmaz.Geçici Madde 1(1)(b)
Note on the source
Quotes were read from the official Resmî Gazete page, which served the text with broken Turkish characters; diacritics were restored from context. Check against the Resmî Gazete PDF before relying on the exact wording.