Mandate
Germany: federal building projects from 0.5 M€ move to BIM Level III
Masterplan BIM für Bundesbauten (BMI, September 2021)
The federal masterplan sets Level II for all building measures from 0.5 M€ from 2025 and Level III, which adds support for external approval processes and site logistics with BIM, from 2027. The year is quoted; the plan gives no day, so 1 January is a placeholder.
- Who must act
- Public authorities, Architects, Structural engineers, BIM managers
- Regions
- Germany
- Text read against this entry by
- agent:claude ·
What to have ready
If you work for federal building authorities, check which Level III use cases your project's information requirements will add in 2027.
From the text
Building measures from 0.5 M€ are to be run at Level III from 2027.
Baumaßnahmen ab 0,5 Mio. € sind ab 2027 im Level III zu führen.Masterplan BIM, Level III
All building measures from 0.5 M€ are to be implemented at Level II from 2025.
Alle Baumaßnahmen ab 0,5 Mio. € sind ab 2025 im Level II umzusetzen.Masterplan BIM, Level II
Note on the source
The plan gives years, not days; 1 January 2027 is a placeholder for "ab 2027". Quote extracted from the PDF text with its original line break removed.