Editing an IFC model by instruction
BIM-Edit: Benchmarking Large Language Models for IFC-Based Building Information Modeling
BIM information managementEvidence & evaluation

What it proposes
BIM-Edit asks language models to make 324 edits to IFC models and scores geometry, semantics and topology separately.
Why it is here
Most text-to-CAD benchmarks score whether a new shape looks right. On a project the request is closer to 'move this wall and keep the doors hosted', and an edit that breaks the relations is worse than no edit. This benchmark scores exactly that.
What was evaluated
324 tasks to create, update or delete elements, phrased three ways: direct, spatial and topological. They run over 11 realistic building models and 36 synthetic scenes. Seven proprietary and open-weight models work in the same agent harness with a code-execution tool. The best average is Gemini 3.0 Flash at 49.48 out of 100: geometry 68.87, semantics 41.81, topology 37.77. No model fully solves more than 3.4% of tasks.
Limits of the evidence
A preprint; tasks run on 11 realistic models and 36 synthetic scenes, so real project files with their own modelling habits are untested.
Evidence check
- Real task?
- Partly. 11 realistic building models and 36 synthetic scenes.
- Repeated runs?
- Temperature 0 where the provider allows it; one run per task, with spread reported across tasks, not across runs.
- Variations tested?
- Three instruction types, create, update and delete, small and large models: controlled variations by design.
- Failures analysed?
- Yes. A failure-cases section with model-specific runtime failure patterns.
- Data public?
- Not stated.
Worth the full paper?
Read the results table before any 'chat with your model' demo. Geometry scores run well ahead of semantics and topology, so the edit looks right in 3D and the IFC is wrong underneath. With 3.4% of tasks fully solved, any AI edit to a coordinated model needs a check on relations, not just a look at the view.